Virtualization/COOP Bagram

In late 2012, Bagram South TCF was faced with electrical issues that in order to be corrected, the whole data center had to be shut down on multiple occasions.  Trace network and virtualization engineers designed a solution to COOP critical services to the north TCF and allowed the electricians to complete the necessary power upgrades in December of 2012.  Al though upgraded and modified to meet the current requirements, much of the solution that the Trace engineers designed then remain in place today.